Injection Molding Factory

Factory Policy

Production System

We support customer with "Experience and Results", and advanced facilities and technical strength.

Production System

  • Sales staff confirms customer's requirements.

Design・Verification

  • Based on the required specification, perform design review.
  • Design product using accumulated know-how and CAD.
  • Implement verification of design using CAE including flow analysis .
  • Able to verify product in actual size shape of 3D prototype.
  • Design・Verification
  • Design・Verification
  • Design・Verification

Mold

  • Maintenance of mold is essential for the stable supply of product. It becomes possible to provide the product with higher accuracy by improving the mold maintenance system.
  • Mold
  • Mold
  • Mold

Molding

  • Using 50t~650t injection molding machine, produce products in various sizes and of high performance resin emphasizing quality.
  • Molding
  • Molding
  • Molding

Annealing

  • Provide the product which hardly deforms after molding by annealing process.
  • Annealing
  • Annealing

Second operation

  • Perform not only injection molding, but also second operation.
  • Second operation
  • Second operation
  • Second operation
  • Second operation

Inspection・Evaluation

【Quality Control・Quality Assurance】
Have various inspection facilities to ensure reliability.
Perform measurement and evaluation in the controlled temperature and humidity condition.
Working for establishing the quality assurance system to be trusted by customer.
  • Inspectio・Evaluation
  • Inspectio・Evaluation
  • Inspectio・Evaluation

クリーン対応

  • Able to meet the requirement that cleanliness is needed by work in clean booth and product cleaning.
  • クリーン対応
  • クリーン対応
  • クリーン対応
  • After service by sales is also well prepared.